Featured project
White Shaker Kitchen and New LVP Floors in a Pool Home, Mid-Job
· Southwest Florida
Progress photos from a single-story pool home: new wide-plank light oak LVP through the living room, bedrooms and kitchen, fresh gray paint, and white shaker cabinets being set under a black-framed window that looks out at the screened pool.
Photo 1- Licensed & insuredFL CRC1327831
- A+ BBB ratingAccredited business
- 5.0 on GoogleRated by homeowners
- Family-ownedBased in Port Charlotte, FL
- Financing availableAsk at your estimate
Project details
- Location
- Southwest Florida
Scope of work
- Wide-plank light oak LVP through the living room, hallway, bedrooms and kitchen
- Baseboards held off until the floor is complete, to cover the expansion gap
- Walls painted warm gray; existing vaulted ceiling and fans kept
- White shaker base cabinets with an apron-front sink base and three-drawer bases
- Glass-door upper cabinets at the end of the run
- Sink base cut for supply lines and drain; counter outlets stubbed
- Black-framed window over the sink and black-framed slider to the paver lanai
- Countertops, backsplash and trim still to come when photographed
About this project
What a remodel looks like halfway through
Most project photos are taken on the last day. These were taken in the middle of the job, which is when you learn the most about how a contractor works. The house is a single-story Southwest Florida pool home with a vaulted living room ceiling, a screened pool cage and a brick-paver lanai. By the time these were shot the new floor was down everywhere, the walls were painted, and the kitchen cabinets were going in.
The floor went first. Wide-plank light oak LVP runs through the living room, down the hall and into both bedrooms in a single direction, so the house reads as one space instead of a set of rooms. Look at the bottom of the walls: the baseboards are not back on yet. That is the correct order. The floor is laid with an expansion gap at every wall, and the base goes on afterward to cover the gap, not the other way around. By the sliding door you can see the foam underlayment and two sample planks sitting on it.
The walls have been painted a warm gray. One closet still shows the old salmon color behind its opening, so paint was still being finished room by room when the camera came out. In the living room the vaulted ceiling and ceiling fans stayed; the floor and paint do most of the work of making a 1980s or 1990s house feel current, at a fraction of the cost of moving walls.
The kitchen is the busiest photo. White shaker cabinets are being set on the finished floor: a farmhouse-style apron sink base in the center, three-drawer bases on each side, and glass-door uppers at the end of the run. The cabinet tops are open and there are no counters yet, which is normal. The countertop template is taken only after every base is set, shimmed and screwed together, so the stone fits the cabinets as they really are. Above the sink is a black-framed window looking straight at the pool, and to the right a black-framed sliding door opens onto the lanai.
One photo shows the back of the sink base from above, with the openings cut for the supply lines and the drain. Those cut-outs look rough on purpose: they are hidden inside the cabinet, and what matters is that the box sits level and the plumbing comes through where the sink and disposal need it. The wires stubbed out of the wall behind the cabinets are for the counter outlets, which get trimmed out after the backsplash.
Doing floors, paint and a kitchen together is cheaper and faster than doing them one at a time over three years, mostly because the sequence is planned once: floor, paint touch-ups, cabinets, counters, backsplash, baseboards, final paint. Each trade comes once instead of coming back to work around the last one's finish.
If you are planning a whole-interior refresh, ask any contractor: What is the order of work, and why? Does the new floor run under the cabinets or stop at them? Who takes the countertop template, and when? Will the baseboards be replaced or reinstalled? Prestigious Home Improvements is a family-owned, licensed contractor (CRC1327831) based in Port Charlotte, handling floors, kitchens and whole-home remodels across Southwest Florida. Call for a free in-home estimate.
Looking for a whole-home remodeling contractor in Southwest Florida?
This job is one example of what our own crew builds for homeowners around Port Charlotte and the rest of Southwest Florida. If your house has a similar problem, a free visit is the quickest way to learn what fixing it would involve.
- Florida Certified Residential Contractor CRC1327831, fully insured
- Written workmanship warranty
More Work Like This
View all projects →
Our job photoSarasota County · Oct 2025
Aluminum Folding Window Wall in a Steel Building in Sarasota County
A large two-tier aluminum window assembly, four folding sashes over four fixed lites, installed in a plywood-sheathed wall inside a steel-framed building in Sarasota County.
See the project
Our job photoSouthwest Florida
Gray Shaker Kitchen With an Espresso Island and Quartz Counters
A full kitchen in light gray shaker cabinets with crown molding, a charcoal-stained island under white quartz, a glossy subway-tile backsplash and a butler's pantry nook by the laundry room, all on new wide-plank light oak LVP.
See the project
Our job photoSouthwest Florida
Wide-Plank LVP Throughout a Condo, With a White Shaker Kitchen
A condo unit with new brown-oak wide-plank LVP running through the great room, kitchen, hallway, bedrooms and laundry closet, and a white shaker kitchen with a French-door fridge, a built-in microwave island and crown molding, photographed just before the baseboards went back on.
See the project
Frequently asked questions
Planning Something Similar?
Still have a question?
Call and talk to the person who will actually run your job.
Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment
Floor first in most of the house, paint while the room is empty, then cabinets, countertop template, counters, backsplash, baseboards and final paint touch-ups. Doing them together means each trade comes once and nobody has to protect someone else's fresh finish.
A floating vinyl floor needs an expansion gap at every wall. The baseboard goes on after the floor and covers that gap. If the base went on first, the planks would have to be scribed to it and could not move.
Usually yes, with planning. Floors go in one area at a time, and the kitchen is the stretch to plan around: there is a window between demo and the new counters when the sink is out of service. We tell you those dates before work starts.
After every base cabinet is set, leveled and fastened. The fabricator templates the real cabinets, not the drawings, so the stone fits the walls and the sink cut-out lands exactly where it should.
Free estimate · Port Charlotte & SWFL
Get Your Free Estimate From Prestigious
We come to the house, measure, talk through the work and leave you with a written, itemized number. Free and no-obligation, anywhere from Sarasota and Lakewood Ranch down to Fort Myers and Bonita Springs.
- Licensed and insured, FL CRC1327831
- No charge, even if you pick someone else
- We measure in person and price on paper
